Sand Mines Say East Hampton Monitoring Plan Is Overreach - 27 East

Sand Mines Say East Hampton Monitoring Plan Is Overreach

icon 1 Photo
The Sand Highway LLC mine on Middle Highway in East Hampton.

The Sand Highway LLC mine on Middle Highway in East Hampton.

authorMichael Wright on Dec 22, 2021
Mining industry representatives pushed back against the introduction of a proposed new law by East Hampton Town that would create a mandatory groundwater monitoring program for sand mines and properties... more

You May Also Like:

After Cellphone Ban, Group for the East End Encourages Kids To Get Outside and Explore

Earlier this month, Jen Skilbred, the assistant director for environmental education with the Group for ... 26 Oct 2025 by Cailin Riley

Funding FIMP: East Hampton Poised To Spend $27.6 Million Over 30 Years for Montauk Beach Nourishments

The East Hampton Town Board is poised to spend $27.6 million via a 30-year agreement ... 15 Oct 2025 by Jack Motz

Leader of Othodox Christians To Visit Southampton, Bless Shinnecock Bay

The religious leader of Orthodox Christianity, His All-Holiness Ecumenical Patriarch Bartholomew, will visit the East ... 19 Sep 2025 by Staff Writer

East Hampton Town Takes First Look at Proposed Tree Protection Law

As it lags behind statewide, East Hampton Town is looking at becoming the latest East ... 17 Sep 2025 by Jack Motz

Group for East End Osprey Survey Shows More Nests but Fewer Fledglings

Ospreys, or fish hawks, the birds whose population was decimated by the use of the ... 15 Sep 2025 by Stephen J. Kotz

With Enforcement Plan in Place, East Hampton Town Permits New Temporary GeoCubes at Lazy Point

The East Hampton Town Building Department has permitted a Lazy Point homeowner to replace a ... 10 Sep 2025 by Jack Motz

Fate of Southampton Town-Owned Poxabogue Field, Within Sagaponack Village, Is Debated at Town Board Meeting

When Geri Bauer purchased a little over 8 acres of subdivided land in what is ... by Cailin Riley

Dry Times: Tracking Water Hogs and the Fight to Conserve | 27Speaks Podcast

It’s been a hot, dry summer, and in late July the Suffolk County Water Authority ... 28 Aug 2025 by 27Speaks

Lazy Point Dune Gains Around 20 Feet Three Years After Drainage Tube Installation

For three years, an engineer has been tracking the fixed position of a dead tree ... 27 Aug 2025 by Jack Motz

Big Winds and Erin's Waves Made for Perfect 'Perfect Storm' to Foilers

Amid the easterly gale that whipped Block Island Sound into a froth of white caps ... by Michael Wright